2024 Accessibility Project

Status

Bidding Closed

Bid Date 8/6/24 2:00pm

Company & Contacts

City of Martinez
Ali Hatefi  

Location

Martinez, CA

Description of Work: Furnish all labor, materials, tools, equipment and supervision and perform all work necessary for and incidental to the construction of the project known as the 2024 Accessibility Project, City Project No. C1040/C1071. The work includes but is not limited to constructing concrete curb, gutter and ramps and related improvements at various locations throughout the City of Martinez. Work shall include traffic control, pedestrian detours, staging of the work, temporary stormwater pollution control, clearing and grubbing, adjustment of existing utility boxes, replacement of concrete curb, gutter, ramps, sidewalk, driveway, and installation of hot mix asphalt plugs and conforms, concrete wheel stops, removal and installation of thermoplastic pavement stripes and markings, relocation of signs, and such other items or details that are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer.

The Engineer’s Estimate is: $240,000